Manufacturing module (BOMs, orders, costing, shop floor)
Enables the whole manufacturing loop: bills of materials (BOM), manufacturing orders, routings and work centers, WIP, costing (SAP CO-PC) and the shop-floor terminal. A wholesaler with no in-house production does not need it — switch it off; the data is kept. Tomorrow (or for a separate legal entity) — switch it back on.
BOM versions and statuses, components, batch size and unit cost — in one card, not a separate report. Ranked raw-material substitutes and substitution rules for shortages. An empty bill is refused at launch. Import from 1C and Excel included.
MRP and MPS work out what to buy and launch and when; APS spreads it across capacity and shifts. You see where the plan breaks against resources.
Work orders on work centres, operation-level execution, output and scrap. A Gantt chart shows what moves when one thing moves.
The bill sets the standard; alongside it live actual order cost, variances by price, usage, efficiency and overhead, costing cycles with freeze and postings, and work in progress by work centre. One connected loop, not scattered reports.